Showing posts with label U.S. FINANCIAL CRISIS. Show all posts
Showing posts with label U.S. FINANCIAL CRISIS. Show all posts

Monday, July 18, 2011

DTN News: U.S. Department of Defense Contracts Dated July 18, 2011

DTN News: U.S. Department of Defense Contracts Dated July 18, 2011
(NSI News Source Info) WASHINGTON - July 18, 2011: U.S. Department of Defense, Office of the Assistant Secretary of Defense (Public Affairs) Contracts issued July 18, 2011 are undermentioned;

CONTRACTS

ARMY

ITT Systems Corp., Colorado Springs, Colo., was awarded a $267,918,208 cost-plus-award-fee contract. The award will provide for the modification of an existing contract to provide base operations and security support services in support of the military troops and equipment moving through the country of Kuwait. Work will be performed in Kuwait, with an estimated completion date of Sept. 28, 2015. The bid was solicited through the Internet, with five bids received. The U.S. Army Contracting Command, Rock Island, Ill., is the contracting activity (W52P1J-10-C-0062).

Lockheed Martin, Gaithersburg, Md. (W912DY-10-D-0042); IAP Worldwide Services, Inc., Cape Canaveral, Fla. (W912DY-10-D-0044); General Dynamics IT, Fairfax, Va. (W912DY-10-D-0045); BTF Solutions, Dallas, Texas (W912DY-10-D-0046); and Military Healthcare Outfitting & Transition, Irvine, Calif. (W912DY-10-D-0047), were awarded a $135,000,000 firm-fixed-price indefinite-delivery/indefinite-quantity multiple-award-task-order contract to split between each company. The award will provide for a modification of an existing contract to exercise a one-year option. Work location will be determined with each task order, with an estimated completion date of June 28, 2014. The bid was solicited through the Internet, with seven bids received. The U.S. Army Engineering & Support Center, Huntsville, Ala., is the contracting activity.

Northrop Grumman Technical Services, Sierra Vista, Ariz., was awarded a $49,123,938 cost-plus-fixed-fee contract. The award will provide for the capabilities based rotation support for operations in Iraq. Work will be performed in Sierra Vista, Ariz., with an estimated completion date of July 14, 2012. One bid was solicited, with one bid received. The U.S. Army Contracting Command, Redstone Arsenal, Ala., is the contracting activity (W58RGZ-08-C-0025).

Science Application International Corp., McLean, Va., was awarded a $44,262,164 firm-fixed-price, indefinite-delivery/indefinite-quantity contract. The award will provide for the modification of an existing contract to provide maintenance and sustainment of non-intrusive vehicle inspection systems vehicle and cargo inspection systems. Work will be performed in McLean, Va.; San Diego, Calif.; Afghanistan; and Iraq, with an estimated completion date of Aug. 3, 2012. One bid was solicited, with one bid received. The U.S. Army Contracting Command, Warren, Mich., is the contracting activity (W52H09-08-D-0348).

Phillips and Jordan, Inc., Knoxville, Tenn., was awarded a $32,420,192 firm-fixed-price contract. The award will provide for the dewatering and construction operations as part of the Indian River Lagoon South restoration. Work will be performed in Indian Town, Fla., with an estimated completion date of March 27, 2014. There were 208 bids solicited, with 14 bids received. The U.S. Army Corps of Engineers, Jacksonville, Fla., is the contracting activity (W912EP-11-C-0019).

CDM Federal Programs Corp., Libby, Mont., was awarded a $30,000,000 cost-plus-fixed-fee contract. The award will provide for the architect-engineering and surveying services at the Libby Superfund Site, Libby, Montana. Work will be performed in Libby, Montana, with an estimated completion date of July 13, 2016. The bid was solicited through the Internet, with one bid received. The U.S. Army Corps of Engineers, Omaha, Neb., is the contracting activity (W9128F-11-D-0023).

SRI International, Menlo Park, Calif., was awarded a $22,053,476 cost-plus-fixed-fee contract. The award will provide for the necessary support to improve the state-of-the-art airborne ultra high frequency radar for detecting targets of interest. Work will be performed in Menlo Park, Calif.; Arlington, Va.; Helena, Mont.; Ann Arbor, Mich.; Princeton, N.J.; Iraq; Bridgewater, Va.; and Dothan, Ala., with an estimated completion date of April 15, 2012. The U.S. Army Corps of Engineers, Vicksburg, Miss., is the contracting activity (W912HZ-11-C-0029).

Sektech Corp., Inc., Hyattsville, Md. (W912JD-11-D-0021); Piquette & Howard Electric Service, Inc. Plaistow, N.H. (W912JD-11-D-0020); P & S Construction, Inc., North Chelmsford, Mass. (W912JD-11-D-0019); Optimum Building Systems and Management, Inc., Litchfield, N.H. (W912JD-11-D-0018); Nickerson & O’Day, Inc., Brewer, Maine (W912JD-11-D-0017); Monument Construction, L.L.C., Nashua, N.H. (W912JD-11-D-0016); Management Strategies, Inc., Monroe, Conn. (W912JD-11-D-0015); Legion Construction, Inc., Chelmsford, Mass. (W912JD-11-D-0014); KMK Construction, Inc., Eliot, Maine (W912JD-11-D-0013); K-Con, Inc., North Charleston, S.C. (W912JD-11-D-0012); Ganneston Construction, Corp., Augusta, Maine (W912JD-11-D-0011); Eastco Building Services, Inc., Deer Park, N.Y. (W912JD-11-D-0010); DF-N, J.V., Frankfort, Ill. (W912JD-11-D-0009); CPM Constructors, Freeport, Maine (W912JD-11-D-0008); Cornerstone Construction Services, L.L.C., Reading, Mass. (W912JD-11-D-0007); CCB, Inc., Westbrook, Maine (W912JD-11-D-0006); Bowman Constructors, Newport, Maine (W912JD-11-D-0005); Blane Casey Building Contractor, Inc., South China, Maine (W912JD-11-D-0004); BBIX, L.L.C., Boston, Mass. (W912JD-11-D-0003); Atlantic Defense Company, L.L.C., Bangor, Maine (W912JD-11-D-0002); and Acadia Engineers & Constructors, L.L.C., Durham, N.H. (W912JD-11-D-0001), were awarded a $20,000,000 firm-fixed-price indefinite-delivery/indefinite-quantity multiple-award-task-order contract to split between each company. The award will provide for the maintenance, repair, construction, and design-build services in support of National Guard activities in the state of Maine. Work location will be determined with each task order, with an estimated completion date of July 14, 2016. The bid was solicited through the Internet, with 22 bids received. The National Guard Bureau, Augusta, Maine, is the contracting activity.

DRS Technical Services, Herndon, Va., was awarded a $19,632,592 cost-plus-fixed-fee contract. The award will provide for the specialized training and mentoring services for Afghanistan’s Ministry of the Interior and the Afghan National Police. Work will be performed in Afghanistan, with an estimated completion date of Jan. 16, 2012. One sole-source bid was solicited, with one bid received. The U.S. Army Contracting Command, Aberdeen Proving Ground, Md., is the contracting activity (W15P7T-11-C-B001).

GARCO Construction, Spokane, Wash., was awarded a $14,612,000 firm-fixed-price contract. The award will provide for the construction of nine six-plex buildings and four four-plex buildings, which includes expanding and replacing existing utility infrastructure and site utilities, landscaping and miscellaneous site development work. Work will be performed in Fort Lewis, Wash., with an estimated completion date of March 30, 2013. The bid was solicited through the Internet, with six bids received. The U.S. Army Corps of Engineers, Seattle, Wash., is the contracting activity (W912DW-11-C-0011).

North Wind Services, LLC, Idaho Falls, Idaho, was awarded a $12,000,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract. The award will provide for the architectural engineer hazardous toxic radiological waste services to be performed in various locations throughout Alaska. Work location will be determined with each task order, with an estimated completion date of June 20, 2016. The bid was solicited through the Internet, with 13 bids received. The U.S. Army Corps of Engineers, Joint Base Elmendorf-Richardson, Alaska, is the contracting activity (W911KB-11-D-0006).

NAVY

Northrop Grumman Systems Corp., San Diego, Calif., is being awarded a $24,947,647 modification to a previously awarded cost-plus-incentive-fee contract (N00019-07-C-0055) for autonomous aerial refueling technology maturation and demonstration activities in support of the Navy Unmanned Combat Air System Demonstration. Services to be provided include air systems, air vehicle segment, and mission management segment requirements definition; integration planning and verification planning; and definition of certification requirements and approach. Work will be performed in San Diego, Calif., and is expected to be completed in December 2012. Contract funds will not expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Md. is the contracting activity.

Econco Broadcast Service, Woodland, Calif., is being awarded a $14,942,898 firm-fixed-price requirements contract for repair parts for the AN-SPY-1 Radar Program within the AEGIS system. Work will be performed in Woodland, Calif., and is to be completed by March 2017. Contract funds will not expire before the end of the fiscal year. This contract was not awarded through full and open competition, with two firms solicited and two offers received. NAVSUP Weapon Systems Support, Mechanicsburg, Pa., is the contracting activity (N00104-11-D-D006).

General Dynamics Advance Information Systems (GD-AIS), Inc., Fairfax, Va., will be awarded job orders that will be issued as cost-plus-fixed fee in the estimated amount of $9,916,846 under a three-year basic ordering agreement for a continuation of systems engineering support and system software/firmware support for Blocks 1A, 1B1, 1B2, and 1B3 in support of AN/SLQ-32(V) electronic warfare system. These services will support upgrades to the system that were developed by GD-AIS as part of the Surface Electronic Warfare Improvement Program. Blocks 1A, 1B2, and 1B3 all utilize the improved control and display (ICAD) console, which is a GD-AIS developed upgrade based on the commonly used AN/ULQ-70 console. Block 1B1 provides a stand-alone specific emitter identification (SEI) capability, AN/SSX-1, which was also developed by GD-AIS. Block 1B2 integrates the control of the SEI capability into AN/SLQ-32 via the ICAD console. Block 1B3 brings additional signal processing capability to the AN/SLQ-32, also utilizing ICAD for control. Work will be performed in Fairfax, Va., and is expected to be completed by January 2015. Contract funds will not expire at the end of the current fiscal year. The basic ordering agreement was not competitively procured because only one responsible source and no other suppliers will satisfy the agency requirements. Naval Surface Warfare Center, Crane Division, Crane, Ind., is the contracting activity (N00164-11-G-PM04).

Rolls-Royce Corp., Indianapolis, Ind., is being awarded a $9,512,571 modification to a previously awarded firm-fixed-price contract (N00019-10-C-0020) for the procurement of 17 CV-22 low power repairs for AE1107 turboshaft engines for the Air Force. Work will be performed in Oakland, Calif. (70 percent), and Indianapolis, Ind. (30 percent), and is expected to be completed in February 2012. Contract funds in the amount of $9,512,571 will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.

DEFENSE LOGISTICS AGENCY

Burlington Apparel Fabrics, Greensboro, N.C., was issued a modification exercising the second option year on the current contract SPM1C1-09-D-0030/P00007. Award is a fixed-price with economic price adjustment contract with a maximum $9,973,260 for poly/wool cloth. Other locations of performance are various places throughout Virginia and North Carolina. Using service is Navy. The date of performance completion is July 11, 2012. The Defense Logistics Agency Troop Support, Philadelphia, Pa., is the contracting activity.



*Link for This article compiled by Roger Smith from reliable sources
U.S. DoD issued No. 624-11 July 18, 2011
*Speaking Image - Creation of DTN News ~ Defense Technology News
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News

©

COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS


DTN News - U.S. FINANCIAL CRISIS: Obama, lawmakers To Resume Debt Talks

DTN News - U.S. FINANCIAL CRISIS: Obama, lawmakers To Resume Debt Talks
(NSI News Source Info) TORONTO, Canada / WASHINGTON, USA - July 18, 2011: President Barack Obama and congressional leaders will continue to negotiate a possible deficit reduction deal this week to clear the way for congressional Republicans to back an increase in the federal debt ceiling.

While discussions continued over the weekend after the last full negotiating session Thursday, no significant progress has occurred and the chances for a comprehensive deficit deal sought by Obama in coming weeks appear remote.

Without a major deal, Congress would have to focus instead on a smaller agreement to raise the debt ceiling or face the unprecedented situation in 15 days of the government not having enough money to pay all its bills. The debt ceiling has reached its $14.3 trillion legally permitted maximum.
Senate leaders are working on a possible debt ceiling measure, based on a plan that Senate Minority Leader Mitch McConnell, R-Kentucky, unveiled last week. That plan would give Obama power to raise the borrowing limit by a total of $2.5 trillion but also require three congressional votes on the issue before the 2012 general election.

According to Senate aides from both parties, a revised version of the McConnell plan being put together with Senate Majority Leader Harry Reid, D-Nevada, could come up for consideration this week, but only after legislators vote on Republican measures calling for spending cuts, caps on future spending and a balanced budget amendment to the Constitution.

While the GOP measures are expected to fail, the votes would satisfy a Republican desire to get Democrats on the record with their opposition to them.

Leaders from both parties say the McConnell-Reid plan is not the preferred option, but they don't rule it out if efforts to strike a broader deal fail.

"The minimum is I believe the debt will be extended," budget director Jacob Lew told the ABC program "This Week" on Sunday. "... Our efforts over the next days will be to, in addition to that, do as much as we possibly can to make the tough decisions" needed for a broader deal.

Obama warned last week that he could not guarantee older Americans will receive their Social Security checks next month if a deal is not reached. GOP leaders accused the president of resorting to scare tactics.

"This is a different situation than the United States has ever faced," Lew said of a possible default. He refused to discuss how spending might be prioritized, saying, "Once one gets into the business of trying to ask about setting priorities, it misses the fundamental question, which is that it's unacceptable for the United States to be in a place where -- whether it's a Social Security recipient or a soldier or somebody who is just owed money by the government -- can't be paid because we have not done our job."

Republicans complained that they have offered the only concrete proposals to address mounting deficits and federal debt so far, from a House budget proposal earlier this year to the "cut, cap and balance" plan pushed by conservatives that comprises spending cuts, caps on future spending as a percentage of economic production and a balanced budget amendment to the constitution.

"I'm a little frustrated that -- you've heard it in the press conference of the president, you've heard it today from the administration's spokesman -- they are never willing to be specific about the reductions in spending that they would be willing to do," conservative Sen. Jon Kyl, R-Arizona, said Sunday.

"The president always just holds out this idea that, well, if you'll raise taxes, and he is very specific about the taxes he wants to raise, then (he) might be willing to look at cuts elsewhere," Kyl said. "Well, of course, that's just not good enough. So, the point I'm trying to make is when the president says he's willing to compromise, understand why Republican leaders have been pretty reluctant to go along with this deal because we frankly don't know where the spending reductions come, but we do know where the taxes are."

Democrats said the Republican proposals won't pass, and they called for their GOP colleagues to work with them on reaching a compromise that would get the debt ceiling raised and include significant deficit reduction steps to signal markets that the United States is taking serious measures.

"This notion that we somehow have to change the Constitution to do what we were elected to do is just plain wrong," Sen. Dick Durbin, D-Illinois, said on the NBC program "Meet the Press."

"Bottom line is, those who want to push a balanced budget amendment are saying, 'I can't promise you that I won't steal again, but I will vote for the Ten Commandments.' "

Obama evoked compromises of the past in calling Saturday for a commitment to shared sacrifice to break the current impasse on the debt ceiling.

"Let's be honest. Neither party in this town is blameless," the president said in his weekly address. "Both have talked this problem to death without doing enough about it. That's what drives people nuts about Washington."

Obama reiterated his call for higher taxes on the wealthy and reforms to politically popular entitlement programs such as Medicare and Social Security. He cited budget deals forged by President Ronald Reagan and then-Democratic House Speaker Tip O'Neill as well as President Bill Clinton and former Republican Speaker Newt Gingrich, crediting them with making sacrifices that benefited the common good.

"We are all part of the same country. We are all in this together," Obama said.

Republicans, meanwhile, renewed their call for an amendment to require a balanced budget.

"The only reason this administration doesn't want a constitutional amendment is because they want to keep spending the American people's money," Sen. Orrin Hatch of Utah said in the GOP response Saturday. "And the only reason congressional Democrats would refuse to pass it, is because they know the people of this country would rise up and quickly ratify it."

Lew said Sunday that the kind of constitutional change sought by Republicans would be "quite draconian" by imposing strict spending limits rather than simply requiring a balance between revenue and spending.

He called for Republicans to compromise in their opposition to any kind of tax increase, saying, "We need a partner to work with.

"We need to get the job done now," Lew added, noting that credit rating agencies were warning of a downgrade for the United States. "The whole world is watching."

The tense negotiations between top Democrats and Republicans, reflecting core ideological principles on taxes and the size of government, have become a race against the clock. If Washington lacks the money to pay its bills, interest rates could skyrocket and the value of the dollar could decline, among other things.

The seriousness of the situation was reinforced Thursday when a major credit rating agency, Standard and Poor's, said it was placing the United States' sovereign rating on "CreditWatch with negative implications." Moody's Investors Services -- another major rating agency -- said Wednesday that it would put the sterling bond rating of the United States on review for possible downgrade.

Hatch argued that Obama refuses to reform entitlement programs and is pushing "job-killing tax hikes." The six-term senator had his own view of previous deals struck between the two parties.
"We've been down this road before," he said. "In 1990, Congress and the president struck a deficit reduction deal that combined spending cuts with tax increases. Unfortunately, while the tax hikes remained, the spending restraint did not, and our debt has marched higher."

House Republicans show no sign of accepting higher taxes on the rich as part of a so-called "balanced" approach to debt reduction. GOP leaders, who consider tax hikes detrimental to the economy, blasted the president Friday morning for failing to produce what they consider to be a legitimate spending cut plan.

No formal negotiating sessions took place over the weekend. On Saturday, internal discussions continued at the White House a day after a meeting involving Treasury Secretary Tim Geithner, Chief of Staff Bill Daley, House Speaker John Boehner, R-Ohio, and House Minority Leader Eric Cantor, R-Virginia, said a Democratic source familiar with the debt negotiations and a Republican aide, both on condition of not being identified.

Obama has made it clear he still favors a package that generates savings of approximately $4 trillion over roughly the next decade.

Fallback plans that take major entitlement reform and tax hikes off the table may include between $1.5 trillion and $1.7 trillion in savings previously agreed to in talks led by Vice President Joe Biden.

Administration officials have also discussed extending and possibly expanding the payroll tax cut -- a nod to sagging employment figures -- as well as extending unemployment insurance, according to a Democratic official familiar with the talks.

One of the issues at the heart of the current debate is Obama's call for more tax revenue by allowing tax cuts from the Bush presidency to expire at the end of 2012 for families making more than $250,000. His plan would keep the lower tax rates for Americans who earn less.

Obama noted earlier this week he is not looking to raise any taxes until 2013 or later. In exchange, the president said, he wants to ensure that the current progressive nature of the tax code is maintained, with higher-income Americans assessed higher tax rates.

But resistance to higher taxes is now a bedrock principle for most Republicans, enforced by conservative crusaders such as political activist Grover Norquist. Norquist's group, Americans for Tax Reform, has sponsored a high-profile pledge to oppose any tax increase.

The pledge has been signed by more than 230 House members and 40 senators, almost all of them Republicans.


STORY HIGHLIGHTS

  • *Congress to vote on Republican measures first, aides say
  • *Sen. Kyl says Republicans need specifics from Obama to make a deal
  • *White House budget director refuses to discuss spending priorities under default
  • *The United States must raise its $14.3 trillion debt ceiling by August 2 or risk a default

*Speaking Image - Creation of DTN News ~ Defense Technology News
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News

©

COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS